Local drainage Ringleben, construction phase 2011 - 2014 (Thuringia)

Project

Gradual restoration of the local sewerage and reconciliation of wastewater to the treatment plant Artern.

Customer

Kyffhäuser Abwasser- und Trinkwasserverband Artern

Am Westbahnhof
06556 Artern

Herr Paul
Tel.: 0 34 66 / 329-212 

Planning services

Project planning according to HOAI, § 56 para. 1 of Structures, work phases 2-7 for

  • 6.1 km sewer DN 200
  • 4.3 km storm sewer DN 300 ... DN 700
  • a waste water pumping station Double
  • 2 pieces Introduction Buildings in waters II. Procedure
  • Creating documents for approval in accordance with § 17 ThürWG
  • subsidy applications

Description

Construction of local sewerage Ringleben

The city Ringleben located approximately 10 kilometers west of Artern. Due to its location on the outskirts of Ried areas only a small gap exists within the resort. The settlement structure is very dense, predominantly terraced row. In the pre-planning a cost comparison was conducted that examined monetarily all variants developed so that now only an additional pumping station must be built within the village. Thus, the channel depths could be limited, since due to the high groundwater level represents the water retention is very cost-intensive. In 2010, the funding application was prepared by the IB Meinecke GmbH. From 2011 the cross-town wastewater and rainwater canals were built in the south separating system after completion of the planning. To this end, as part of the implementation planning all homeowners were visited and the votes on the construction of house connections carried out and documented in coordination protocols. At the same time, the water pipes were renewed. Currently about 3.0 km of sewerage are already built. In 2013 and 2014 the canal construction continues. To this end, the funding application were asked this year.

Approval schedule

Execution plan