ATURIS.Basic-Template 2 fluid

Seit dem 11.10.1956 im Landkreis Nordhausen! 

Redesigning the city park in the city of Nordhausen

Project

Occasion
The city park is a popular resort town of Nordhausen. In particular, the animal enclosure, the duck and the swan pond used by the North houses brisk. In order to make these areas more tangible, the City Park and City Park Bach were renovated, redesigned and upgraded.

Our Services

  • Landscape conservation planning gem. 
  • § 26 Abs. 1 HOAIRepresentation of conflicts in text and map, as well as development of an action plan 
  • Free plant design gem. 
  • § 38 Abs. 1 HOAIEnvironmental Impact Assessment of the project Open Country Biotopkartierung according Mapping of Thuringia Site supervision Project Description 

One of the main objectives of the project was the natural transformation of the city park creek with production of ecological continuity and the promotion of natural conditions in and on water. In a species conservation expert contribution initially the requirements concerning species conservation were shown roughly and evaluated. Furthermore, made extensive studies for flora and fauna of the area. One of the measures of the LBP's were the dismantling of three culverts, reconstruction of the crash at the duck pond in a Sohlengleite as well as structuring the river bed of the brook city park by installing flow control arms. In some sections of the straight course of the city park brook was changed into a meandering. Furthermore, a riparian buffer strips was applied, which was planted on both sides with typical tree species.

Desludging of the swan pond

Redesigning the flow of the city park creek

New bridge building

Establisment of a water fountain

Overflow into the city creek

Extension area of the swan pond