Project Summary:

Hydraulic calculations as part of the project planning § 42 HOAI 2009, LPH 1-4, Honorary Zone III, off-set completion of hydraulic calculations in the context of pre-planning

Category:

Hydraulic

read more >>

Project details:

Hydraulic calculations as part of the project planning § a44 HOAI 2013 LPH 1-4, Honorary Zone III, off-set. Completion of hydraulic calculations of December-2013.

Category:

Hydraulic engineering

read more >>

Project description:

Hydraulic calculations as part of the project planning § 42 HOAI 2009, LPH 2-4, Honorary Zone III, off-set. Completion of hydraulic calculations: September-2013.

Category:

Hydraulic engineering

read more >>

EU WFD surface water body "Obere Helme"

Project description:

Hydraulic calculations as part of the project planning § 42 HOAI 2009, LPH 1-4, Honorary Zone III, off-set. Completion of hydraulic calculations: September-2013.

 

Category:

Hydraulic

read more >>

Project description:

Project planning according to HOAI § 38 Abs. 1 Freianlagen
LPH 1-9, Honorary Zone II, From Phrase
local construction management decrease of May 2012

 

Category:

Hydraulic

read moret >>

Project detail:

In a variant study various possibilities have been established to improve flood protection and tested for feasibility, cost and engage in the types.

As a preferred option, the construction of a flood polders in shunt to apex capping and rehabilitation of the existing flood protection facilities in the local situation in connection with the implementation of a restructuring measures in the area of riverbed dynamics was developed.

Category:

Hydraulic engineering

read more >>

Project detail:

In a variant study various possibilities have been established to improve flood protection and tested for feasibility, cost and engage in the types.

As a preferred variant of the installation of static effective internal seals in the dikes (sheet piling), the upgrading of the existing flood protection walls and a 360 m long new flood protection wall at the sports ground was worked out. After the flood of 2013, the planning based on the current flooding has been calibrated.

Category:

Hydraulic engineering

read more >>

Project detail:

The Thuringian State Institute for Environment and Geology commissioned our office in 2003 with the planning stage in accordance with § 56 engineering structures with the natural expansion of the Wipper in the local situation Seega.

Planning Fundamentals:

Protection target for Seega (100th flood) results of the inventory objective of the WFD Relevant usage structures of inclusion measures in landscape and settlement image

Category:

Hydraulic engineering

read more>>

Flood protection & natural water development on Roßmannsbach in Nordhausen, Thuringia

Project:

Improving flood protection (HQ 25 HQ100) and natural river development

(in accordance with objectives of the EU Water Framework Directi

Category:

drinking water supply

read more >>

Project description:

Construction of a flood retention basin with a volume of approx. 15,000 m³ reconstruction of rainwater drains DN 800 to about 200 m with reconciliation renewal passages establishing dividing structure

 

Category:

drinking water supply

read more >>

Flood protection concept for the local situation Steigerthal, Nordhausen

Project description:

In a variant study various possibilities have been established to improve flood protection and tested for feasibility, cost and engage in the types.</ph4&g

Category:

drinking water supply

read more >>

Flood protection concept for the Ronnebach in the local documents and Rodishain Stempeda, Nordhausen

Project description:

In a variant study various possibilities have been established to improve flood protection and tested for feasibility, cost and engage in the types.

Category:

drinking water supply

read more >>